ECONOMY SYSTEMS · GUIDE 08/50 · FREE REFERENCE

Stress-test the starting economy

The problem

Early imbalance can force players into a single opening move.

Practical procedure

Simulate the first five turns with no upgrades, an early upgrade and a delayed upgrade.

Worked scenario

If the opening budget is 100 and the only affordable upgrade costs 95, new players may lose all flexibility.

Acceptance check

Require at least two viable opening choices and compare their consequences after five turns.

Apply the method

Use the related interactive tool to try the concept on an inspectable example. Record the starting assumptions and expected result before changing settings, then compare what the tool actually does. Where the result differs, keep the release marked experimental and document the discrepancy.

Further reading: Relevant primary technical documentation. This guide is an educational procedure, not a substitute for independent usability or compliance review.